By signing below, verification is made that all permits and/or concrete floor engineering (if required) are the responsibility of the customer. Lum's Sales and Service assumes no liability for the structure or concrete floor in which the lift is to be installed.

2026-04-04

Job Site Information

Site & Tech Specs

Ceiling Height

/

Clearances

Front:

Power Specs

Concrete

inches

Min 4.5" typical requirement

Floor Variance:

Installation Logistics